Went to Powell , Ohio today. There was no one working. All of the electrical/cable/phone lines are in and apparently inspected by the builder. The breaker box is below our bedroom so all of the wiring runs up the back wall in our room and them spreads through out the house. As you can see the garage floor has been poured; the basement floor has also been poured and the concrete cap on the crawl space in done as well. The picture that is not a door is of the crawl space from a mid point in the basement looking toward the front of the house. There is lots of storage space there. I think that the next step is the insulation before the drywall process starts.